> For the complete documentation index, see [llms.txt](https://changelog.visilean.com/llms.txt). Markdown versions of documentation pages are available by appending `.md` to page URLs; this page is available as [Markdown](https://changelog.visilean.com/changelog/release-6.0-2026/lean-ai-assessment-measure-how-well-your-project-really-plans.md).

# Lean AI Assessment: Measure How Well Your Project Really Plans!

Most teams running the Last Planner System track PPC and stop there. But PPC only tells you what happened in the last week not whether milestones are holding, whether tasks are genuinely made ready before they're committed, or whether constraints are being raised early enough to matter. Answering those questions usually means exporting data into spreadsheets and building the analysis by hand, project by project.

#### Why This Matters

Weak planning habits rarely show up as a single failure. They show up as milestones re-dated a fortnight before they're due, tasks committed without a make-ready step, and constraints logged the day work was meant to start. By the time PPC drops, the cause is weeks behind you. Without a consistent way to measure the whole planning system, it's hard to tell which trade, which layer or which habit needs attention and harder still to show improvement.

#### What's New?

* **27 Last Planner System metrics, calculated for you:** The Lean Maturity dashboard (also called the LPS Health Dashboard) pulls your VisiLean task history and constraint log and measures them across four layers SHOULD (master schedule and milestones), CAN (lookahead and make-ready), WILL (commitment and weekly plan) and DID (execution and PPC).
* **Project Score and Plan Reliability:** A single 0–100 score, a status for each layer, a Trade Summary and a **Top Risk to Clear** list that ranks the metrics furthest from target.
* **Layer pages:** Dedicated SHOULD, CAN, WILL and DID pages covering milestone adherence and variance, planning stability, make-ready classes, lead times, proactive vs reactive constraints, on-time starts and finishes, and weekly PPC volatility.
* **Full traceability:** Click any metric to see the exact tasks, milestones, constraints or weeks behind it, and which ones were counted or excluded.
* **Trade Analysis:** Compare every metric trade by trade, with breakdowns by location and organisation where the data exists.
* **Your own targets:** Set targets and amber thresholds per project or as an organisation-wide default.
* **AI Insights:** For Project Admins, Process Managers and Customer Admins a short verdict and action on each metric, a cross-layer synthesis with root causes and top moves, per-metric deep dives, and drafted messages (trade emails, toolbox-talk points, escalations, commitment-review agendas) that you review and send yourself.
* **Project Hub:** See every project's health, PPC and critical count side by side.

#### How It Helps

A **Project Manager** opens the Project Hub on Monday morning and sees one project's health has slipped. The Top Risk list shows a high Make-Ready Bypass Rate, and the audit panel lists the exact tasks committed without a make-ready step enough to take straight into the weekly planning meeting.

A **Planner** notices milestone volatility creeping up on the SHOULD page. The breakdown shows most reschedules happening within 14 days of the baseline date, concentrated in two trades a clear prompt to pull those milestones into the next phase-planning session.

A **Process Manager** runs AI Insights after a poor month, reviews the root-cause chain, and uses the drafted constraint-clearing request to brief the MEP trades, editing the wording before sending it from their own email.

{% hint style="info" %}

#### Key Considerations & Caution Points

**Licence required:** The Lean Maturity icon appears in VisiLean only when your organisation holds the Lean Maturity licence. Contact <support@visilean.com> to have your projects set up on the dashboard.

**Data freshness:** Data refreshes automatically every night and on demand with **Refresh data**. A refresh takes a minute or two, and only one refresh can run at a time per organisation.

**History matters:** Many metrics are calculated from task history. If 10% or more of a project's tasks have no history, a warning appears and the stability and make-ready metrics are understated. Constraint metrics use only constraints linked to a task.

**Missing data:** A layer with no data counts as 0 in the Project Score.

**AI Insights:** AI notes are not regenerated automatically after new data arrives they're marked as outdated until you run the analysis again. AI Insights is powered by Anthropic's Claude; running it sends the project's metric values and trade names to the provider.

**Language:** The dashboard is currently available in English only.