# Release 6.0 2026

We're back with the exciting new updates!

### 🌟 VisiLean API Portal: Securely connect VisiLean to your tools, AI, and workflows !

<figure><img src="https://3533347086-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGVi8TaUbMOyvZHAu4Zb0%2Fuploads%2F5HJMPVKFNCcSNGMYGHzI%2FVisilean%20API%20Portal%20-%20Final.png?alt=media&amp;token=39781693-f890-4fe1-9190-485f13e58eb3" alt=""><figcaption></figcaption></figure>

The VisiLean API Portal gives your team a secure, self-service way to connect your own software, and AI assistants like Claude, directly to your live VisiLean projects. From one place, your Process Manager can create scoped API keys, set up server-to-server OAuth2 credentials, and test every request against sandbox practice data before touching a real programme. Your ERP can pull task progress overnight, Power BI can read constraints for management dashboards, and your own apps can create tasks without anyone retyping data. Through the built-in MCP connector, your team can ask Claude "which constraints are still open on level 3?" and get the answer straight from the live plan. Access is read-only by default and limited to what each person can already see in VisiLean. Webhooks (Beta) notify your systems the moment a task changes through the API, so integrations stay in step without constant polling. Usage analytics, live rate-limit tracking, an organisation-wide view of every key, and a full audit log keep every connection visible and accountable, and any connection can be switched off at any time. Your VisiLean data is no longer confined to the app. It now reaches wherever your team does its work.

Read more 👇

{% content-ref url="/pages/Jzj5KaxiXSW4npmcA05C" %}
[VisiLean API Portal: Securely connect VisiLean to your tools, AI, and workflows !](https://changelog.visilean.com/changelog/release-6.0-2026/visilean-api-portal-securely-connect-visilean-to-your-tools-ai-and-workflows.md)
{% endcontent-ref %}

### 🌟 Activity Briefings : Your Drawings, Connected to the Plan!

<figure><img src="https://3533347086-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGVi8TaUbMOyvZHAu4Zb0%2Fuploads%2FsaHXtbS6XlZaHxpNd6zg%2FDABs%20(1).png?alt=media&amp;token=9457508f-5623-44f4-807b-5c0fb12cd251" alt=""><figcaption></figcaption></figure>

Your SiteBoard is the new 2D Drawings board: load your site drawings, draw zones and locations straight onto them as rectangles or polygons, and link each one to your project's Takt zones or locations. Annotation cards on the drawing show each area's dates, trades, constraint and task counts and delay flags, and Trade Mode breaks them out trade by trade. Open the drawing side by side with Gantt, Takt or the Scheduler clicking a Gantt task zooms to its zone, and selecting a zone highlights its linked tasks. The date range and global filters drive what the cards show, and you can create Takt or Gantt tasks directly from a zone on the drawing. The plan now sits on the same drawing your site team already reads.

Read more 👇

{% content-ref url="/pages/kVrPDPMBxN8wlt5bnOqE" %}
[Activity Briefings: Your Drawings, Connected to the Plan!](https://changelog.visilean.com/changelog/release-6.0-2026/activity-briefings-your-drawings-connected-to-the-plan.md)
{% endcontent-ref %}

### 🌟 VisiLean × Primavera P6 EPPM Integration: Plan and Progress, Always in Step!

<figure><img src="https://3533347086-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGVi8TaUbMOyvZHAu4Zb0%2Fuploads%2FhhBMX751RtuZbkSAHYt4%2FP6.png?alt=media&amp;token=9aca776b-cf46-469f-b835-b169182eb106" alt=""><figcaption></figcaption></figure>

VisiLean now connects directly to Oracle Primavera P6 EPPM, so the master programme and site progress no longer live in two disconnected places. Link a VisiLean project to a P6 programme and import its WBS, activities, planned dates and logic links in one step. From then on, Get updates brings P6 changes into VisiLean, and Send progress pushes percent complete, actual dates, remaining duration, expected finish, labour hours and new site activities back to P6, which then reschedules. Every exchange shows a preview first, every value sent is read back from P6 to confirm it landed, and every run is kept in a history you can download as CSV. Your planner keeps owning the plan in P6, your site team keeps owning progress in VisiLean and both stay in step.

Read more 👇

{% content-ref url="/pages/1YGRCmHzyhl9ZEJSkXA8" %}
[VisiLean × Primavera P6 EPPM Integration: Plan and Progress, Always in Step!](https://changelog.visilean.com/changelog/release-6.0-2026/visilean-primavera-p6-eppm-integration-plan-and-progress-always-in-step.md)
{% endcontent-ref %}

### 🌟 Lean AI Assessment: Measure How Well Your Project Really Plans!

<figure><img src="https://3533347086-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGVi8TaUbMOyvZHAu4Zb0%2Fuploads%2FOeCNgDL6s9TbM35NV6sE%2FAI%20Dashboard.png?alt=media&amp;token=f06d728f-fe7f-4d3e-b35b-acc269f32614" alt=""><figcaption></figcaption></figure>

The new Lean Maturity dashboard measures how closely your project follows the Last Planner System, using 27 metrics across the four planning layers: SHOULD, CAN, WILL and DID. It pulls data straight from your VisiLean tasks and constraint log, refreshes every night or on demand, and rolls the results into a Project Score, Plan Reliability by layer, a Trade Summary and a ranked list of the risks to clear first. Every number can be traced back to the exact tasks, milestones, constraints or weeks behind it, and targets can be tuned per project or across your organisation. Project Admins, Process Managers and Customer Admins also get AI Insights that explain each metric, suggest next-week actions and draft updates for trades or clients. Lean maturity stops being a gut feel and becomes something you can measure, compare and improve week on week.

Read more 👇

{% content-ref url="/pages/fw2fw1aBCyUjTFvybXcy" %}
[Lean AI Assessment: Measure How Well Your Project Really Plans!](https://changelog.visilean.com/changelog/release-6.0-2026/lean-ai-assessment-measure-how-well-your-project-really-plans.md)
{% endcontent-ref %}

### 🌟 Quantities & Workforce, Now Offline on Mobile!

<figure><img src="https://3533347086-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FGVi8TaUbMOyvZHAu4Zb0%2Fuploads%2FBsrsBVU4EuxpwL8fkxQM%2FQuanitites%2C%20Daily%20Quantites%20and%20workforce.png?alt=media&amp;token=ad9797fa-7133-4192-837a-b0eb66fc5a4e" alt=""><figcaption></figcaption></figure>

Workforce and quantity updates no longer have to wait for a signal. In the mobile app, you can now add and edit Planned and Actual Workforce and Daily Quantities while offline, using the existing Offline Mode toggle. Each entry is saved on your device and shows in the task's history straight away, then syncs automatically when you're back online, with retries if the connection is patchy. Foremen and site engineers can record the day's labour and output at the workface — in basements, risers and plant rooms — instead of reconstructing it at the end of the shift. Your quantity and workforce data now reaches the programme as accurately as it was captured.

Read more 👇

{% content-ref url="/pages/PX0LoTIOFnrlIDkFdZwc" %}
[Quantities & Workforce, Now Offline on Mobile!](https://changelog.visilean.com/changelog/release-6.0-2026/quantities-and-workforce-now-offline-on-mobile.md)
{% endcontent-ref %}

### 🔨 Improvements

**Views & Configurations**

* [ ] A new **Apply to all views** toggle carries your active Global Filter and Date Range with you as you switch between Takt, Gantt, Scheduler and Table. If the view you open has a default configuration, that configuration still takes priority. The setting is saved per user, per project.
* [ ] The New Gantt now opens on "Whole Project" when it has no default configuration.

**New Gantt**

* [ ] Column widths you set by dragging in the Task Table now stay put. Adding columns, moving the split boundary or resizing your browser only adjusts the columns you haven't touched, and a horizontal scroll bar appears instead of squeezing your widths.
* [ ] **Go to** on a predecessor or successor in the Relations tab now works even when the target sits inside a collapsed WBS parent the parent expands and the task is highlighted and selected.
* [ ] When a reschedule cascades to dependent tasks, each dependent task's history now names the root task, how far it moved and who moved it, so you can trace exactly why a task shifted. This applies to reschedules made from this release onwards.

**Table View**

* [ ] A new **Timeline View** tab in the New Table View shows your tasks against the selected date range, one column per day, with the same search, filters, grouping, Trade Mode and Excel/PDF export as the Task and Workforce tabs. Switch it on in Settings → Table View.

**Scheduler**

* [ ] The New Scheduler has been tuned for large projects, targeting the slowest actions on a 10,000-task programme: creating and updating tasks, status changes, PNG export, applying configurations, viewing reports, constraint export and applying the global filter.

**Milestones & Takt**

* [ ] The multi-select milestone property panel now has a **Visible in Takt** toggle and a **Display In** section, so you can bulk-convert milestones to Timeline or Zone milestones in one go. Changes show in Takt immediately.

**Property Panel & Multi-Select**

* [ ] If a multi-select bulk edit includes items you can't edit, a **Some Items Can't Be Edited** window now shows the counts and lets you apply the change to the editable items or cancel. A summary afterwards confirms what was applied and what was skipped. This now works the same for Tasks and Milestones.
* [ ] The Attachments tab on the Parent Task and Multi-Select property panels now shows an attachment count, matching the Task panel. The multi-select count totals all selected items.
* [ ] Hovering over a long task name in the New UI property panel now shows the full name in a tooltip.

**BIM Updates**

* [ ] With View Sync and Trade Mode both on, elements outside the paired view's date range now stay wireframe with no trade colour, and only in-range elements are trade-coloured. The split updates as you scroll the date range, and is saved with your Configurations and Reports.
* [ ] In BIM Split View, clicking a task in the **Linked Task Card** now scrolls to that task in the Gantt, Table, Scheduler or Takt pane, highlights it and opens its property panel.

**Reports & Exports**

* [ ] You can now duplicate an entire report folder including every report inside it from the folder's three-dot menu, then name the copy and set its visibility.
* [ ] **Changelog Export** is now available from the Export menu of the New Gantt, New Scheduler and New Table views, so projects without a Takt licence can use it too.
* [ ] The Changelog Export now records deleted Tasks, Zones and Constraints as **Deletion** rows, showing who deleted the item and when. Once an item is deleted, its earlier history no longer appears in the export  only the Deletion row remains.

**Primavera P6**

* [ ] Downloading actuals as a **Primavera P6 XLSX** now lets you choose the date format for Actual Start and Actual Finish date order, year format, month name, leading zeroes and separator — with a live preview, so the file matches your P6 setup. Your choice is remembered per project.
* [ ] Milestones imported from P6 now take their status from your project's **Enforce Workflow** setting. With it off, an End Milestone that's complete in P6 is marked Complete in VisiLean using P6's actual end date, skipping Under Review.

**Power BI Integration**

* [ ] A new **Task Relationships** module in the Power BI / Data API returns each task's predecessors and successors, including link type and lag. Select it under Settings → Integrations.
* [ ] The Power BI task-history feed now includes the cause of predecessor-driven reschedules. This adds two columns and changes the feed's column order, so check any existing Power BI reports built on it.

**Dashboard**

* [ ] An always-visible **Custom Analytics** button now sits next to the Dashboard title, replacing the old hover-only arrow.

**Languages**

* [ ] **French** is now available in the web app alongside English, German and Finnish, covering the interface, notifications, PDF and CSV exports, the Changelog PDF and Report Automation emails.
* [ ] German translations in the mobile app have been corrected, including notification text and the approvals label.
* [ ] Constraint notification labels on web and mobile now read correctly for example, "Constraint Deleted" instead of "Constrainlog Deleted".