🚀Release 6.0 2026

We're back with the exciting new updates!

🌟 VisiLean API Portal: Securely connect VisiLean to your tools, AI, and workflows !

The VisiLean API Portal gives your team a secure, self-service way to connect your own software, and AI assistants like Claude, directly to your live VisiLean projects. From one place, your Process Manager can create scoped API keys, set up server-to-server OAuth2 credentials, and test every request against sandbox practice data before touching a real programme. Your ERP can pull task progress overnight, Power BI can read constraints for management dashboards, and your own apps can create tasks without anyone retyping data. Through the built-in MCP connector, your team can ask Claude "which constraints are still open on level 3?" and get the answer straight from the live plan. Access is read-only by default and limited to what each person can already see in VisiLean. Webhooks (Beta) notify your systems the moment a task changes through the API, so integrations stay in step without constant polling. Usage analytics, live rate-limit tracking, an organisation-wide view of every key, and a full audit log keep every connection visible and accountable, and any connection can be switched off at any time. Your VisiLean data is no longer confined to the app. It now reaches wherever your team does its work.

Read more 👇

⭐VisiLean API Portal: Securely connect VisiLean to your tools, AI, and workflows !

🌟 Activity Briefings : Your Drawings, Connected to the Plan!

Your SiteBoard is the new 2D Drawings board: load your site drawings, draw zones and locations straight onto them as rectangles or polygons, and link each one to your project's Takt zones or locations. Annotation cards on the drawing show each area's dates, trades, constraint and task counts and delay flags, and Trade Mode breaks them out trade by trade. Open the drawing side by side with Gantt, Takt or the Scheduler clicking a Gantt task zooms to its zone, and selecting a zone highlights its linked tasks. The date range and global filters drive what the cards show, and you can create Takt or Gantt tasks directly from a zone on the drawing. The plan now sits on the same drawing your site team already reads.

Read more 👇

⭐Activity Briefings: Your Drawings, Connected to the Plan!

🌟 VisiLean × Primavera P6 EPPM Integration: Plan and Progress, Always in Step!

VisiLean now connects directly to Oracle Primavera P6 EPPM, so the master programme and site progress no longer live in two disconnected places. Link a VisiLean project to a P6 programme and import its WBS, activities, planned dates and logic links in one step. From then on, Get updates brings P6 changes into VisiLean, and Send progress pushes percent complete, actual dates, remaining duration, expected finish, labour hours and new site activities back to P6, which then reschedules. Every exchange shows a preview first, every value sent is read back from P6 to confirm it landed, and every run is kept in a history you can download as CSV. Your planner keeps owning the plan in P6, your site team keeps owning progress in VisiLean and both stay in step.

Read more 👇

⭐VisiLean × Primavera P6 EPPM Integration: Plan and Progress, Always in Step!

🌟 Lean AI Assessment: Measure How Well Your Project Really Plans!

The new Lean Maturity dashboard measures how closely your project follows the Last Planner System, using 27 metrics across the four planning layers: SHOULD, CAN, WILL and DID. It pulls data straight from your VisiLean tasks and constraint log, refreshes every night or on demand, and rolls the results into a Project Score, Plan Reliability by layer, a Trade Summary and a ranked list of the risks to clear first. Every number can be traced back to the exact tasks, milestones, constraints or weeks behind it, and targets can be tuned per project or across your organisation. Project Admins, Process Managers and Customer Admins also get AI Insights that explain each metric, suggest next-week actions and draft updates for trades or clients. Lean maturity stops being a gut feel and becomes something you can measure, compare and improve week on week.

Read more 👇

⭐Lean AI Assessment: Measure How Well Your Project Really Plans!

🌟 Quantities & Workforce, Now Offline on Mobile!

Workforce and quantity updates no longer have to wait for a signal. In the mobile app, you can now add and edit Planned and Actual Workforce and Daily Quantities while offline, using the existing Offline Mode toggle. Each entry is saved on your device and shows in the task's history straight away, then syncs automatically when you're back online, with retries if the connection is patchy. Foremen and site engineers can record the day's labour and output at the workface — in basements, risers and plant rooms — instead of reconstructing it at the end of the shift. Your quantity and workforce data now reaches the programme as accurately as it was captured.

Read more 👇

⭐Quantities & Workforce, Now Offline on Mobile!

🔨 Improvements

Views & Configurations

New Gantt

Table View

Scheduler

Milestones & Takt

Property Panel & Multi-Select

BIM Updates

Reports & Exports

Primavera P6

Power BI Integration

Dashboard